Enterprise Wi-Fi Project Checklist

A checklist that walks through site survey, RF planning, security policy and acceptance testing in enterprise Wi-Fi projects.

Published by: AnatoliaCore Technical Editorial Team

Requirements and Site Data in a Wi-Fi Project

A floor plan is the starting point for desk-based design; wall materials, ceiling height, user movement and interference must be verified on site. The number of APs cannot be set reliably until coverage, capacity and roaming targets are written as separate acceptance criteria.

Wireless design starts with the floor plan, building materials, target areas, user/device density, application needs and existing RF measurements. A ‘signal everywhere’ target does not describe capacity or roaming needs.

AP Placement, Channel and Capacity Plan

The placement plan should show each AP's service area, expected client load and relationship to neighboring cells. Channel and power settings should be treated as a starting design that can be updated after post-installation measurement.

Predictive design is validated against RF conditions on site. AP placement, channel width, the channel/power plan, client capacity and roaming requirements are handled together; simply adding more APs is not a solution.

Wired Infrastructure, PoE and Identity

A wireless design is not complete until switch ports and the PoE budget are verified. The number of SSIDs, the authentication method and VLAN mapping should not be left apart from the RF plan, and the end-to-end user flow should be included in acceptance testing.

Switch ports, uplinks, cabling category and the PoE budget must support the AP model and capacity. Corporate, guest and IoT SSIDs are mapped to authentication, VLANs and access policy.

Wi-Fi design and acceptance checklist

The table below summarizes the key design and validation points of a wireless project, from site input to RF and access acceptance:

Control AreaExpected Output
Site inputFloor plan, materials and RF measurement
CapacityClient density and application needs
InfrastructureCabling, switches, uplinks and PoE
AcceptanceCoverage, SNR, channels, roaming and access

Installation and RF Acceptance Measurement

An acceptance measurement should not consist of a signal heat map alone. The measurement point, client type, test time and load condition should be recorded, and connection setup, roaming and critical application flows should be added to the results file along with coverage.

After commissioning, coverage, SNR, channel utilization, capacity, roaming, DHCP/DNS and critical application access are measured in the target areas. Acceptance points and test load are defined before installation.

Validating Wi-Fi Acceptance Criteria

The design on the floor plan is compared with on-site measurements, and deviations are turned into AP location, radio setting or wired infrastructure actions. The final measurement file and the updated placement plan are handed over to the operations team.

Related Service Pages

To turn this guide into a project, review the service pages below.

Technology Perspective

Cisco product families, use cases and technology selection considerations are covered on our related technology page.