How to Prepare a Disaster Recovery Plan

An enterprise guide to building a disaster recovery plan, running drills and clarifying operational responsibilities.

Published by: AnatoliaCore Technical Editorial Team

Defining the scope of the disaster recovery plan

A disaster recovery plan does not start from a server list alone. Business service, data, application, identity, DNS, network, external service and people dependencies are shown in a single service chain; the plan's activation criteria and decision authority are part of this scope too.

Role and responsibility matrix for critical services

For each service, incident command, infrastructure, application, data, network, security, communications and business unit roles are defined. A phone list alone is not a role matrix until primary and backup owners, decision authority and third-party contacts are written down.

Drill scenario and validation steps

A drill scenario is based on an explicit assumption such as a single component failure, data corruption, an unreachable site or loss of identity/DNS. The start time, data point, component durations, user acceptance and return-to-normal steps are measured.

Keeping the plan alive with continuity metrics

The short checklist below is a practical field reference for disaster recovery planning projects:

Control AreaExpected Output
Service chainApplication, data, identity, network and external dependencies
Decision modelTrigger, authorized role and communication tree
RunbookOrdered technical steps and acceptance check
DrillMeasured duration, data point and open actions

From Scope to an Executable Runbook

The scope table should be turned into a runbook that can be executed during an incident without interpretation. Each step's input, expected result, decision point on failure and condition for moving to the next step should be written explicitly.

The runbook covers activation, communication, dependency order, recovery commands, validation, decision points and the failback/return-to-normal path. Command owners and the required access are checked before the drill.

Validating Drill Results

The plan is validated through the role and decision flow in a tabletop review, through data and system recovery in a technical test, and through user acceptance and total duration in an end-to-end drill. Failed steps are closed with a remediation owner and a retest date.

Technical Components: BIA, Recovery Targets and Failover

A solid disaster recovery plan contains measurable technical decisions, not a generic process description.

  • Business Impact Analysis (BIA): critical systems and dependencies are identified, and each system is assigned an RTO and RPO target.
  • Recovery tiers and sequencing: critical/important/normal tiers; recovery sequencing follows identity and DNS dependencies.
  • Backup and replication: synchronous/asynchronous replication, the 3-2-1 rule, immutable and off-site copies.
  • Failover / failback: switching to the secondary site and back; database consistency is verified.
  • Runbook and DR drill: regular testing; measured RTO/RPO is compared with the target, and deviations get an action and a retest date.

Related Service Pages

To turn this guide into a project, review the service pages below.

Technology Perspective

Veeam product families, use cases and technology selection considerations are covered on our related technology page.

Veeam Details

Quote and Contact

You can schedule a technical pre-assessment call to scope the work for your organization.

Verify with the official documentation

Assess the disaster recovery plan together with the business impact analysis, recovery priorities and regular drills.

NIST SP 800-34 — Contingency Planning